  • Lower Meadow Drive River Walk – Adding sidewalk, signage & striping to make traffic one-way; additional parking. Completed in October 2021 with $135,000 in matching grant money from CDOT's Revitalizing Main Streets program

  • Crosswalk – CR 65 at Bergen Park near the RTD lot. Started in October 2021 with grant money from CDOT's Revitalizing Main Streets program

  • Installed water fountain in downtown Evergreen

  • Evergreen Parks and Recreation District to use $50,000 in matching ELF funds to secure and complete the Evergreen Lake North Trail

Lower Meadow Drive.jpg
Crosswalk.jpg
Current Projects

Approved ELID Projects

(Evergreen Local Improvement District)

Map of Project Sites - All.jpg

 Here is the list  (with accompanying maps) of the 17 projects across Evergreen that were approved to be constructed over the next 10 years and funded by ELF (with support from a variety of grants). This list was created after many years of community feedback.

 ELID Boundary Map  (the ELID map coincides with the Evergreen Metro District boundary map)

ELID Projects List Downloadable Powerpoint 

Past Projects

(Funded, Matched or Advocated by ELF)

  • Downtown Evergreen Flood Relief

  • Evergreen Trails Master Plan

  • Evergreen Lake Connector Trail

  • Four defibrillators (and the annual maintenance) for downtown Evergreen

  • Curb to curb paving of Main Street, Evergreen

  • Christ the King Pedestrian Crossing

  • Local elementary school mural project in the Lake Connector Trail tunnel

image001.png
Approved Project Costs

Approved ELID Projects

(Evergreen Local Improvement District)

Approved ELID Sites

 Here is the list  (downloadable PowerPoint) of the 17 projects across Evergreen that were approved to be constructed over the next 10 years and funded by ELF (with support from a variety of grants). This list was created after many years of community forums and feedback. Jeffco determines which projects on the Evergreen Legacy Fund wish-list can be completed, and fixes the timeline for those projects. This shows the 17 Approved 2020 ELID Projects in the order decided on by the Jeffco Board of County Commissioners (i.e., not in numerical order).

 ELID Boundary Map  (the ELID map coincides with the Evergreen Metro District boundary map)

  • This will be an evolving spreadsheet as projects get costed, approved and ultimately funded and completed!

  • This initial costing info is from the 2018 spreadsheet and will be updated as is available.

Approved ELID Projects
Past Projects

Past Projects

(Funded, Matched or Advocated by ELF)

  • Downtown Evergreen Flood Relief

  • Evergreen Trails Master Plan

  • Evergreen Lake Connector Trail

  • Four defibrillators (and the annual maintenance) for downtown Evergreen

  • Curb-to-curb paving of Main Street, Evergreen

  • Christ the King Pedestrian Crossing

  • Local elementary school mural project in the Lake Connector Trail tunnel

Elevated walkway linking the Evergreen North Trail to downtown Evergreen