​South Hatch Dr • Install appx. 200’ of sidewalk along Hatch Dr. from the entrance to Wilmot Elementary School to Buffalo Park Rd. Connect to existing sidewalk at Wilmot Elementary School and install ADA curb ramps at the school site entrance.
Project Map
Project Summary
-
​Evergreen Parks and Recreation District to use $50,000 in matching ELF funds to secure and complete the Evergreen Lake North Trail
Start Date: May 1, 2023
​
-
CR73 – Buffalo Park to SH74. This project is currently a planned T&E project with federal funding. Reconstruct the roadway to install curb and gutter, sidewalk, bike lanes, and shoulders along CR73 from SH74 to Buffalo Park Rd. (By Jefferson County)
​​
-
Bergen Parkway at Sugarbush Drive Intersection Pedestrian Improvements. The project will replace the existing concrete islands and corner ramps at the intersection. Americans with Disabilities Act (ADA) compliant ramps and crosswalks will be installed, and the islands will be larger, creating a safer pedestrian crossing at the intersection. Asphalt for the entire intersection will be replaced, repaved, and restriped. The traffic configuration with the four-way stop will not change.
​
Approved ELID Projects
(Evergreen Local Improvement District)
Here is the list (with accompanying maps) of the 17 projects across Evergreen that were approved to be constructed over the next 10 years and funded by ELF (with support from a variety of grants). This list was created after many years of community feedback.
​
ELID Boundary Map (the ELID map coincides with the Evergreen Metro District boundary map)
-
Downtown Evergreen Flood Relief
-
Evergreen Trails Master Plan
-
Evergreen Lake Connector Trail
-
Four defibrillators (and the annual maintenance) for downtown Evergreen
-
Curb to curb paving of Main Street, Evergreen
-
Christ the King Pedestrian Crossing
-
Local elementary school mural project in the Lake Connector Trail tunnel
Approved ELID Projects
(Evergreen Local Improvement District)
Here is the list (downloadable PowerPoint) of the 17 projects across Evergreen that were approved to be constructed over the next 10 years and funded by ELF (with support from a variety of grants). This list was created after many years of community forums and feedback. Jeffco determines which projects on the Evergreen Legacy Fund wish-list can be completed, and fixes the timeline for those projects. This shows the 17 Approved 2020 ELID Projects in the order decided on by the Jeffco Board of County Commissioners (i.e., not in numerical order).
​
ELID Boundary Map (the ELID map coincides with the Evergreen Metro District boundary map)
-
This will be an evolving spreadsheet as projects get costed, approved and ultimately funded and completed!
​​
-
This initial costing info is from the 2018 spreadsheet and will be updated as is available.
-
‘Evergreen Blooms at the Dam’ Mural done by the EHS Mural Club (Metro Building). Completed Fall 2022
-
Lower Meadow Drive River Walk – Added sidewalk, signage & striping to make traffic one-way; additional parking. Completed in October 2021 with $135,000 in matching grant money from CDOT's Revitalizing Main Streets program
-
Crosswalk – CR 65 at Bergen Park near the RTD lot. Used grant money from CDOT's Revitalizing Main Streets program​​
-
Bear Creek Children's Mural! Pedestrian tunnel under Main St. Completed Fall 2019
-
Installed water fountain in downtown Evergreen
-
Downtown Evergreen Flood Relief
-
Evergreen Trails Master Plan
-
Evergreen Lake Connector Trail
-
Four defibrillators (and the annual maintenance) for downtown Evergreen
-
Curb-to-curb paving of Main Street, Evergreen
-
Christ the King Pedestrian Crossing